Relative to the project's life cycle, when is the cost per risk discovered typically highest

Respuesta :

andriansp andriansp
  • 01-12-2017
Relative to the project's life cycle, the cost per risk discovered is typically highest during the end of closing of a project.
For any project, a lot of risk will only be spotted after the company started its own operation. Because up to this point, the company usually already determine which type of risk is the most likely to happen.
Answer Link

Otras preguntas

Let f(x)=186+5e−0.1x . What is f(6) ? Enter your answer, rounded to the nearest tenth, in the box.
What is the distance between (8,-3) and (4,-7)
What is 4 x 1/7 = ? Thank you
A problem states: "There are 2 more horses than cows in a field. There are 16 animals in the field in all. How many horses are there in the field?" Let h repres
Pruitt lives in a city that is typically dominated by a maritime tropical air mass. After listening to the weather update, he learns that a maritime polar air m
Can you mark the parenthesis in this sentence with dashes? The evil witch a jealous and bitter woman wanted to cast her spells.
which atoms have the same number of neutrons? which is the correct answer and why? 1.H-1 and He-3 2. H-2 and He-4 3. H-3 and He- 3 4. H-3 and He-4
What type of sentence is My brother watched tv while I studied for my test
Write a 350- to 500-word story about being a prehistoric artist. Create a clay statuette or primitive tool.
Can you answer thank you