muhammaddabdull muhammaddabdull
  • 25-07-2017
  • Mathematics
contestada

If 5 workers can pave 10 driveways in 30 days, how many days would it take 20 workers to pave 38 driveways?

Respuesta :

musiclover10045
musiclover10045 musiclover10045
  • 25-07-2017

5*30/10 = 20x/38

150/10 = 20x/38 =

5700/200x=

x= 5700/200 = 28.5 days

Answer Link

Otras preguntas

Helllllppppppppppp ....................
Why is King hopeful about the prospects for equal rights for black Americans? Give specific examples and reasons he mention to support your answer
Help .............................................
express 3+4x-x^2 in the form y=p-(q-x)^2
Which change is most likely to occur when a molecule of H2 and a molecule of I2 collide with proper orientation and sufficient energy? 1. a chemical change, be
Give three examples of structural adaptations and three more on behavioral adaptations. Thank you
In the summer, laboratories can become hot and stuffy. Is it appropriate to wear flip-flops or sandals to lab to keep cooler?
The elderly can have impaired immune systems, making them susceptible to infections that can take longer to heal. Which of the following would be most helpful i
The radius of The moon is one_fourth and its mass is one eighty-first that of The earth. If The acceleration due to gravity on The surface of The earth is 9.8m/
What is the probability of someone correctly guessing your Social Security number on the first attempt? (Assume all digits 0-9 are available for use)