jordidiaz8104 jordidiaz8104
  • 23-07-2017
  • Business
contestada

âa(n) ________ starts with the assumption that current activities in a company will not automatically continue in the next period.

Respuesta :

andriansp andriansp
  • 31-07-2017
A zero based budget starts with the assumption that current activities in a company will not automatically continue in the next period.
Zero based budget is designed to justify all existing expense in order to find out the true value of a company, which means that this method will not recognize any form of earning and liabilities that haven't been actualized by the company.
Answer Link

Otras preguntas

Reflect the point (-8,-3) across the x-axis
The volume of a 15.8% by mass solution is 146.4 ml. the density of the solution is 1.084 g/ml. what is the mass of solute in this solution
What is the unit rate of $1.12 for 8.2 ounces?
Which of the these BEST describes why the Zhou dynasty collapsed? A) feudal power structure that gave too much power to regional lords B) failure to keep up
which is the most reasonable explanation for a drop of temperature for gas
please need help asap!!
what is dramatic irony?
Drawing a blank on this
Specifications for the computer upgrades are 77 minutes and 81 minutes. Estimate the percentage of process output that can be expected to fall within the specif
What is the most common cause of collisions boating?