mohsinabanu mohsinabanu
  • 22-02-2017
  • Mathematics
contestada

20 men can complete the construction of a road in 30 days. If 5 more men join the team,In how many days will the work be over?

Respuesta :

ashlipi57 ashlipi57
  • 22-02-2017
Technically since the road is already built, it wouldnt take any more days. But if they are starting over at the beginning with 25 men, it would take them about 25 days
Answer Link

Otras preguntas

Qualitative researchers have an inherent obligation and contract with participants to use data in the way that has been specified. a. True b. False
In a workbook's theme, _____ colors are designated for text and background, _____ colors are used for accents and highlights, and _____ colors are used for hype
Which is the reduced price?
Rarely, the vintage date on a bottle of wine is not the same as the harvest year, but is the calendar year before the harvest year. for which wine on the list b
Why are thermometers filled with alcohol instead for water?
What is (6/x+8)(7/8x)
A particular interaction force does work wint inside a system. the potential energy of the interaction is u. which equation relates u and wint
Starting from rest, a solid sphere rolls without slipping down an incline plane. at the bottom of the incline, what does the angular velocity of the sphere depe
Which ordered pairs are solutions to the inequality x+3y≥−8? Select each correct answer.
This reconstruction era policy gave voting rights only to people whose grandfathers had been legally allowed to vote, thus excluded freedmen from voting. this w