jillyfishloser8472 jillyfishloser8472
  • 21-04-2022
  • Business
contestada

After reviewing the project scope statement, the owner specifies that costs MUST stay within $400,000. This criterion is classified as

Respuesta :

Parrain
Parrain Parrain
  • 25-04-2022

The criterion where costs must remain at a certain level according to the owner or investments is called a Constrained criterion.

What is a constrained criterion?

This is a requirement in a project scope statement that limits the costs to a certain level.

In this scenario, there is a requirement that costs should not go beyond $400,000 which means tha there is a limit to the cost in the project.

This is therefore a constrained criterion.

Find out more on project scope statements at https://brainly.com/question/14498531.

Answer Link

Otras preguntas

I need help.. 7k/8-3/4-5k/16=3/8seven "k" over eight minus three fourths minus five "k" over sixteen equals three eighths
in the given figure , if PQ ll RS , angle TRS = 105 and angle RTP = 30 , then the value of x is
You want to determine if one peak is steeper than another peak, based on a topographic map. What would you see on the steeper peak?
In the given figure , if angel ROQ = 90 and angel POS : angel ROS = 4 : 5 , then the value of angel SOQ is
did dinosaurs really have brains in their tails?
are cockroaches active during the day?
Summarize the way plants store extra sugar
For which system of equations is (2, 2) a solution? A.–3x + 3y = 0x + 6y = 10B.–2x + 5y = –64x – 2y = 4C.5x – 2y = –63x – 4y = 2D.2x + 3y = 104x + 5y = 18
what is a cardinal? please help
What was the Battle of Wounded Knee?