TyreeSerini163 TyreeSerini163
  • 24-03-2014
  • Mathematics
contestada

Six people to can perform a task in 8 days. If we add 2 equally able people, how long would it take?

Respuesta :

madankapoor10
madankapoor10 madankapoor10
  • 24-03-2014
1 man does 1/48th piece of work per day
then 8 man do 1/6th piece of work per day
so they can do the work in 6 days

Answer Link
salmheiri
salmheiri salmheiri
  • 21-02-2022

Answer:

6 days

Step-by-step explanation:

Answer Link

Otras preguntas

A boy's first ejaculation, spermarche, usually occurs around age __________, more than a year after the body begins producing sperm. 12 13 14 15
What are some comparisons between the symptoms of the female reproductive problems, menstrual cramps, and vaginitis?
How does the tide cycle affect erosion along a sea coast?
Ken is 6 feet tall and is walking away from a streetlight. The streetlight has its light bulb 14 feet above the ground, and Ken is walking at the rate of 1.7 fe
What bill did president truman veto because he said it would create a thought police?
Which of the following were powers that the framers believed did not need to be expressly written in the U.S. Constitution? a. expressed powers b. obvious power
Read the excerpt, and then answer the question. "Mr. Gray was thirty-eight, and tall and slender…unsentimental, and with that kind of trim-chiseled face that ju
Identify the correct statements about the eugenics movement.
How many states were part of the EEC 1957 -1993 years?
A rectangular plot of ground measuring 12 meters by 20 meters is surrounded by a sidewalk of a uniform width. the area of a sidewalk is 68square meters what is