Robert takes 10 days more than Peter to complete a job. If they work together they will
complete the job in 12 days. How long will Peter alone take to finish the job?

Respuesta :

dede70800 dede70800
  • 23-02-2021

Answer:

I believe the answer is 2

Step-by-step explanation:

Answer Link

Otras preguntas

what is 13 approximated to the nearest tenth? Answers: A. 3.5
Which steps can be used to solve for the value of y ? 2\3(y+57)=178
Choose the absolute value inequality that corresponds to the given compound inequality.–5 < x + 2 < 9
The maximum energy available for useful work from a spontaneous reaction (A) free energy (B) lattice energy (C) kinetic energy (D) activation energy (E) ionizat
solve the problem explain your answer  6/7m = 5/6
how do you estimate 12.062g to the nearest tens of a gram
A square tray has an area of 196 square inches. What is the length of one side of the tray?   A.
What is 423.408 rounded to the neatest hundredth
How do magnetic patterns in the rocks along the mid-oceanic ridges explain seafloor spreading? A. As oceanic crust sank beneath continental crust, the cooling
use substitution to solve the sytem: 5x-3y=-20 and x=3y-16