alexissvjackson
alexissvjackson alexissvjackson
  • 25-09-2020
  • Engineering
contestada

Which of the following is a job title for a worker in the design and pre-construction phase of a construction project?
O carpenter
O construction superintendent
O architect
O building Inspector

Respuesta :

nibhakarna13 nibhakarna13
  • 25-09-2020

Answer:

construction superintendent

Answer Link

Otras preguntas

How do plants and animals help to maintain a balance or carbon dioxide in the atmosphere
What effects did napoleon intend the sale of louisiana to have on france, the united states, and britain?
evaluate the expression when a=3 and x=-7. 8x-a
what is the icd-10 code for hypertension
Information processing that begins with raw sensory data and finishes with analysis in the brain is called _____.
Which sentence clearly conveys the message? question 4 options: after declining for months, we tried a new tactic to increase our roi. we tried a new tactic to
What does it mean to be a polar molecule
Maria bought 2 toasters and an oven for $196. Lily bought a toaster and 2 ovens for $173. How much is a toaster?
A plumber has a 36-in pipe he must cut it into two pieces so that one piece is 14 inches longer than the other how long is each piece ?
Help. Plus the top one I just guessed ahah x