tleppek3079 tleppek3079
  • 25-02-2020
  • Computers and Technology
contestada

A/an ___________ is a scheduling tool that sets the standard and nonworking time for the project and is used to assess how tasks and resources are scheduled.

Respuesta :

Аноним Аноним
  • 25-02-2020
The answer is a calender
Answer Link

Otras preguntas

Which ruropean ports were used by crusaders heanding for the holy land?
how do you make a short secret, such as a password, become long enough for use? salting key elongation ephemeral operations key stretching
rank in order, from largest to smallest, the angular velocities ω1, ω2, and ω3 of these points.
a proton follows the path shown in (figure 1). its initial speed is v0 = 2.1×106 m/s.
Advantages of ETFs over mutual funds include all but which one of the following? Multiple choice : - ETFs trade continuously, so investors can trade throughout
kanye west pulled out of which big music festival in april, two weeks before he was scheduled to appear?
Show limit points of sequence are different than limit points of set if point has to be different that x
given the history of the family, what sort of changes do you think would be most likely to make the extended family more relevant again?
The construction manager for ABC Construction must decide whether to build single family homes, apartments, or condominiums. he estimates annual profits (in $00
igure 30-44a shows a wire that forms a rectangle (w 20 cm, h 30 cm) and has a resistance of 5.0 m . its