litaltwizer8834 litaltwizer8834
  • 23-08-2019
  • Computers and Technology
contestada

In a doubly linked chain implementation of a queue, what is the performance when the dequeue operation

A. O(1)

B.O(n)

C.O(logn)

D.O(n2)

Respuesta :

Cetacea
Cetacea Cetacea
  • 28-08-2019

Answer:A) O(1)

Explanation:While dequeuing operation takes place,that is the elimination of the front element from the queue.In doubled linked list/chain, the dequeue operation operates at the consecutive elements lined in the chain with O(1) time period for the eliminating the item  or returning the last value from the link along with the reference.from the chain link.Therefore, the correct option is option(A).

Answer Link

Otras preguntas

how to solve -6r(4r-5)-2(r-2) plz...
Dental Instruments are packaged or wrapped to.. A) cut down on the time needed for the sterilization process. B) prolong the useful life of the instruments and
What is half of the product of 8 1/7 and 7 4/5
When a number x is multiplied by 4, the result is 25 . What is the value of x? Drag and drop the correct number into the box so that the equation is true.
A computer game that can be purchased online and played right away has good _____ utility. a.form b.information c.value d.time
A chemical reaction produces solid sulfur as a product. Which unit should be used to describe the mass of the sulfur produced?
i need help with #16. please show an example, i do not get this,
team a won 19 games, team b won 40 games and team c won 22 games. who came in 1st, 2nd, 3rd?
I need help with number 21.
whats the outlier (i tried every calculator and it said there are none!) 42,8,54,37,29