johnka37 johnka37
  • 24-05-2018
  • Mathematics
contestada

If a job can be completed in 4 hr, then the rate of work is __ of the job per hour.

Respuesta :

hhong2021 hhong2021
  • 24-05-2018
1 divided by 4 is 0.25 or 1/4
Answer Link
mmpeachey107
mmpeachey107 mmpeachey107
  • 24-05-2018
To find the rate of work, split up the hour by 4. So, 1 divided by 4.  This makes .25 (also written as 1/4).  So the rate of work is 1/4 of the job per hour.

Hope this helps! Can I have Brainliest? :)

Answer Link

Otras preguntas

14 gal/sec = ____ qt/min ? please show work(:
How to find a sum of a number
Name 3 numbers between 0.33 and 0.34
Which statement describes how electric charges affect each other? 1. positive and negative charges repel 2. two positive charges attract 3. two negative charge
the Declaration of Independence, Jefferson refers to natural rights as _____.
For what value of x is the rational expression below undefined?(3x-12)/(9-x)
I need help on translating The sum of one third a number and 25 is as much as twice the number
Sammy and David were selling water bottles to raise money for new football uniforms. Sammy sold 5 water bottles for every 3 water bottles David sold. Together t
5.55 as a fraction or mixed number in simplest form
round 1,129.872 to the nearest whole number