mimireds8679 mimireds8679
  • 26-03-2024
  • Mathematics
contestada

A can do a job in 3 days less time than B. A works at it alone for 4 days and then B takes over and completes it. If altogether 14 days were required to finish the job, then in how many days would each of them take alone to finish it?
A. 17 days, 20 days
B. 12 days, 15 days
C. 13 days, 16 days
D. None of these

Respuesta :

Otras preguntas

Write an algebraic expression: X squared less than 15
Find the area pls hurry I need for homework pls show work or will not accept and I will give Brainly
A 2-pound box of candy cost $8.00. What was the cost per ounce (1 pound= 16 ounces) A) $0.25 B) $0.50 C) $0.80 D) $0.20
Two infinite nonconducting sheets of charge are parallel to each other, with sheet A in the x = -2.15 plane and sheet B in the x = +2.15 m plane. Find the elect
the product of three negative integers is positive. True or False
Type an equation in y= mx form​
What does 12/30 go into
5+8 to the power of -2 x2-
A study conducted in 2000 found that the mean number of children under 18 per household in a certain community was 1.7. A statistician is trying to determine wh
Simplify these problems to help me understand on how to do the problems 3/4/9/x^2 4/u/u^2/16