xMABRYx132 xMABRYx132
  • 24-01-2024
  • Physics
contestada

The speed of the mass at point A is 3.2 m/s, and at point B, it is 6.0 m/s. How much work is done on the mass between A and B by the force of friction?
a. 3.8 J
b. 6.8 J
c. 9.6 J
d. 12.2 J

Respuesta :

Otras preguntas

b. 4(3x + 2) - 5(7x + 5) I Need Help
Point V lies between points U and W on . If UW = 9x – 9, what is UW in units? 5 units 6 units 30 units 36 units
What is the Instrument that used to measure the force and vilocity of wind
A physics instructor wants to produce a double-slit interference pattern large enough for her class to see. For the size of the room, she decides that the dista
At the start of its fiscal year, a company anticipated producing 300,000 units throughout the year. The annual budgeted manufacturing overhead was $150,000 for
Convert .040 m to mm
Convert the decimal number -17 to binary (2's complement)
One medium circle and one small circle touch each other, and each circle touches the larger circle. The figure shows two circles of different radius inscribed i
two-fifths of the square of a number j
How many minutes will it take you to finish a 5 km race at an average speed of 7.0m/s?