groovymar1037 groovymar1037
  • 22-01-2024
  • Engineering
contestada

Engineering cost estimates are usually based on operating conditions that are considered:
A. optimal.

B. practical.

C. attainable.

D. historical.

E. realistic.

Respuesta :

Otras preguntas

Why do scientists need to follow a method?
1/5 x 7/8 x 5/6 what is the product?
Make an input-output table for the function y = 2x - 2 with the domain {1,2,3}.
a quarterback completed 0.6 of his passes during a game write the decimal as a fraction
Which type of rock is created when lava cools and hardens? a. metamorphic b. igneous c. cement d. sedimentary
Which diaspora took the jews to what is modern-day turkey? hellenistic babylonian roman
What is the range of the function on the graph? (Image) all the real numbers all the real numbers greater than or equal to 0 all the real numbers greater than o
Estimate to determine if the difference of 6.2 -4.96 is less or greater than one
What bio molecule stores carbonhydrates in plants?
Color blindness primarily affects