A project has a beta of 1.08, the risk-free rate is 4.0%, and
the market risk premium is 7.6%. The project's expected rate of
return is _____%.

Respuesta :

Otras preguntas

Ken spends 1/5 of his money on a dictionary. He gives $21 to his brother and has1/2 of his money left. How much money does Ken have left?
Though most volcanoes are mountains, most mountains are not volcanoes, why or why not?
I am so confused on functions! Please help!
What are 2 thirds of 800
what is the 23rd term from these sequences   5,6,7,8,9
the highest recorded temperature in the uk is 39° c. the lowest recorded temperature in the uk is - 27° c What is the difference between these two amounts?
the boiling point of krypton is -152°c. the boiling point of radon is -6 °c What is the difference between the two boiling points?
use the equation y= -2+1. complete each problem(0,_)      (-5,_)      (20,_)      (-68,_)
find the midpoint of the line segment joining the points P1 and P2P1=(3,-4); P2=(5,4)
if f(x)=2x+1,what is f(-3)