mbahadurrana63
mbahadurrana63 mbahadurrana63
  • 23-12-2022
  • Mathematics
contestada

12 workers can do a piece of work in 30 days.find how many workers should be added to finish the work in 24 days.​

Respuesta :

Otras preguntas

I really need help with Study Island ELA. I need some one who is really good at ELA. Thanks!
Describe how Egypians used hieroglyphics and papyrus
In the metaphor of language as a layer cake given in your study unit, which of the following words could be considered to be a frosting word? A. Occasionally B
The boiling point of a pure substance is defined as the temperature at which: A) the kinetic energy of the molecules begins to increase B) the vapor pressure eq
in a class of 24 students, 25 percent of them failed a test. How many students failed a test
Which author describes Athens as a place with time for pleasant relaxation? _____________
To determine the appropriate landing speed of an airplane, the formula D = .1x 2 − 3x + 22 is used, where x is the initial landing speed in feet per second and
i have a quiz, help me plz! Which describes an action of Caesar Augustus? A. He plunged the Roman world into a civil war. B. He established an imperial governme
4. One of the offices at the company was being repainted. Riley’s father challenged him to figure out how many quarts of paint would be needed. The dimensions o
suppose a person has a small intestine that has fewer villi than normal. would the person mostly be overweight or underweight? explain