nenedabestt nenedabestt
  • 21-11-2022
  • Mathematics
contestada

14 workers can dig 9 m long trench in one day. How many workers would dig 27 m long trench of the same type in 1 day?

Respuesta :

Otras preguntas

8 minus the quotient of 15 and y
how do you simplify this ? 8(x - 4) - 6(x - 1) + 9x
Muddy water contains microorganisms, clay, and silt. Which of the following statements suggests that muddy water is a suspension? A.It is a heterogenous mixture
Use vagabond in a sentence?
The general process in which molecules move from an area of higher concentration to an area of lower concentration is called ____________. A. osmosis B. diffusi
Pepsin, a common enzyme found in the stomach, is most active at pH values between 0.5 and 2.5. It works slowly between pH values of 2.6 and 3.4. Beyond a pH of
Loftus used her research to prove that __________. A. memories of childhood trauma are usually true B. adults’ memories are concrete and rigid C. children have
Which of the following was NOT a cause of the Spanish American War? A. The Cuban Missle Crisis B. Yellow Journalism C. The Sinking of the Maine D. American
In which situation is the object experiencing balanced forces? A) A girl swings on a swing at the playground. B) A car brakes as it approaches a traffic light.
celeste hiked 1.8 miles in 0.75 hour what is her average speed